Below stairs tool

Staggered wake planner

When many machines are powered on remotely, the commands can go out one after another with an even gap instead of all at once. Type your own numbers to estimate how long the whole round takes and how many machines are still booting at the same moment.

Ring the bells in turn

A whole number from 1 to 10,000.

0 sends every command at the same moment.

From the power-on command to ready, as you have timed it.

How the estimate is worked out

The planner uses only the three numbers you enter: n machines, a gap of g seconds between power-on commands and a boot time of b seconds for each machine.

Total time T = (n − 1) × g + b

Last command sent at (n − 1) × g

Most booting at once the smaller of n and ⌈b ÷ g⌉ (n when g = 0)

Assumptions behind the estimate

  • Every machine takes the same boot time, and its boot starts the moment its power-on command is sent.
  • The commands go out with exactly the gap you enter, starting at 0 seconds with machine No. 1.
  • A machine counts as ready, and stops booting, at the instant its boot time ends.
  • Seconds are rounded to the nearest millisecond, with exact halves rounding up, before the sums are made.
  • Nothing here contacts a machine or reads any product data. Network delay, retries and machines that need a second attempt are not included, so treat every result as an estimate.

Units and planner limits

The planner works in whole milliseconds (one millisecond is one thousandth of a second, see SP 330 - Section 3, NIST) and uses the day, hour and minute only to show long totals and to set its input cap: a day is 24 hours of 60 minutes of 60 seconds, which is 86,400 seconds (SP 330 - Section 4, NIST).

These limits are the planner's own choices, not rules of any product: up to 10,000 machines, up to 86,400 seconds for the gap and for the boot time, and a drawn timeline of at most 24 machine rows (the first 12 and the last 12 when there are more). The totals always cover every machine.

A worked example

Twelve machines, a 5 second gap and a 45 second boot time: the last command goes out at (12 − 1) × 5 = 55 seconds, the last machine is ready at 55 + 45 = 100 seconds, and at most ⌈45 ÷ 5⌉ = 9 machines are booting at the same moment.